Description • The floor to be installed should be flat and dry. • Minimum power is 10 Amper / 2250 Watt. • Flooring can be done when the bathroom is tidy, windows are mounted glass (to avoid water). • Installation process and then let stand for 1 week (seen condition and condition in field, whether it is dry and not moving), and then do sanding.